Epoxy Coal tar is known that solvent free Epoxy Coating. It is non porous have good chemical resistant.
The ratio will be slightly depending upon the temperature and working condition.
The concrete/cement plastered surface shall be stable in construction free from cracks, pot holes, honey combs etc. The concrete should be cured as per for minimum of 28 days moisture free and the surface shall be dry, clean even in slightly rough, in line and level, maintaining required slope etc.,
The Surface must be clean & sound, remove all dirt, grease, curing compounds and other foreign matter by mechanical abrasion for acid etching. Remove water & dust from all surface prior to application.
Mild steel surface are best prepared by sand blasting to remove all rust or scale. If sand blasting is not possible, power tool cleaning, wore brushing or abrading with coarse emery paper may be resorted to.
01 | Working time 30°C | 20 minute |
02 | Mixing Viscosity @ 25°C | 3000 to 6000 m pa. |
03 | Specific gravity | 1.15 ± 0.05 |
04 | Covering Capacity | 300-350 grm/per coat/M2 |
05 | Thickness | 100 micron / coat |
It is advisable to apply at least two coats to get an adequate film thickness.
01 | Epoxy Resin | 12 month at the temperature 30°C (±2°C) |
02 | Epoxy Coal tar | 12 month at the temperature 30°C (±2°C) |
All two components are stored in cool and dry place under the roof until ready to use it original unopened (Sealed) containers.
01 | Epoxy Resin | 25 OR 30 kgs. Plastic Carboy OR MS Drum |
02 | Epoxy Coal tar | 30 kgs. Plastic Carboy OR MS Drum |